Procedure

Application Procedure:


STEP 1- Ensure the surface area is cleaned with lacquer thinner then apply Hull Master on top of the cleaned surface with a foam roller or brush so that it won't pick up any debris overlap during application.


STEP 2- Hull Master requires a double coat application. Apply coats between 45 minutes intervals.


STEP 3- Cure product for minimum of twenty four (24)hours before moving the vessel to switch jack stand in order to prepare and coat those areas. After this is accomplished, cure for an additional 24 to 30 hours dependent on the thickness of the coat and the temperature and humidity.